Your email has been sent.
Airport Business Park Cherry Orchard Way 40,530 sq ft Industrial Property Southend On Sea SS2 6UN £8,700,000 (£214.66/sq ft)



Investment Highlights
- Industrial (B2 & B8)
- Freehold
- 20000 Approx Sq Ft
Executive Summary
Strategically positioned to provide quality business space accommodation adjacent to Europe's fastest growing airport, a short distance from the M25 motorway and set to improve on delivery of the Lower Thames Crossing.
Located 3 miles north from Southend-on-Sea town centre, the site sits alongside the B1013 and 6 miles from the A130/A127 junction.
Airport Business Park benefits from roadside frontage to the B1013 Cherry Orchard Way, which connects to the A127 trunk roads to the north of the town. Local occupiers include:
- Jaguar Land Rover
- Toomey Motor Group
- Holiday Inn
- University of Essex
- South East Essex College
- Proximity to residential developments
DESCRIPTION:
Airport Business Park Southend is a 60 acre multi-use business park delivered through a joint venture partnership between Henry Boot Developmentss (HBD) and Southend-on-Sea City Council. Despite approx 400,000 sq ft of bespoke employment space having already having been built and let/sold, opportunities remain for further 'state of the art' industrial facilities of between 20,000 sq.ft. to 77,600 sq.ft. These are offered on a Design & Build basis with an approx delivery time of 12-15 months. Freehold & Leasehold opportunities.
Property Facts
| Price | £8,700,000 | Construction Status | Proposed |
| Price per sq ft | £214.66 | Net Internal Area (NIA) | 40,530 sq ft |
| Sale Type | Owner Occupier | No. Floors | 2 |
| Tenure | Freehold | Year Built | 2025 |
| Property Type | Industrial | Tenancy | Single |
| Property Subtype | Warehouse | Parking Allocation | 1.73/1,000 sq ft |
| Costar Property Class | B | Eaves Height | 26 ft 2 in (7.98 m) |
| Total Plot Size | 2.59 ac | No. Drive In / Grade-Level Doors | 3 |
| Price | £8,700,000 |
| Price per sq ft | £214.66 |
| Sale Type | Owner Occupier |
| Tenure | Freehold |
| Property Type | Industrial |
| Property Subtype | Warehouse |
| Costar Property Class | B |
| Total Plot Size | 2.59 ac |
| Construction Status | Proposed |
| Net Internal Area (NIA) | 40,530 sq ft |
| No. Floors | 2 |
| Year Built | 2025 |
| Tenancy | Single |
| Parking Allocation | 1.73/1,000 sq ft |
| Eaves Height | 26 ft 2 in (7.98 m) |
| No. Drive In / Grade-Level Doors | 3 |
Amenities
- Roller Shutters
Space Availability
- Space
- Size
- Space Use
- Condition
- Available
The new estate road is in the final phase of construction, opening up all of the individual development sites across the 60 acre business park. We are now in negotiations with a number of other key occupiers across the park and can offer bespoke industrial facilities from 14,365 sq.ft. to 77,600 sq.ft. that can be delivered in 12-15 months.
The new estate road is in the final phase of construction, opening up all of the individual development sites across the 60 acre business park. We are now in negotiations with a number of other key occupiers across the park and can offer bespoke industrial facilities from 14,365 sq.ft. to 77,600 sq.ft. that can be delivered in 12-15 months.
| Space | Size | Space Use | Condition | Available |
| Ground | 36,182 sq ft | Industrial | Shell And Core | Now |
| 1st Floor | 4,348 sq ft | Industrial | Shell And Core | Now |
Ground
| Size |
| 36,182 sq ft |
| Space Use |
| Industrial |
| Condition |
| Shell And Core |
| Available |
| Now |
1st Floor
| Size |
| 4,348 sq ft |
| Space Use |
| Industrial |
| Condition |
| Shell And Core |
| Available |
| Now |
Ground
| Size | 36,182 sq ft |
| Space Use | Industrial |
| Condition | Shell And Core |
| Available | Now |
The new estate road is in the final phase of construction, opening up all of the individual development sites across the 60 acre business park. We are now in negotiations with a number of other key occupiers across the park and can offer bespoke industrial facilities from 14,365 sq.ft. to 77,600 sq.ft. that can be delivered in 12-15 months.
1st Floor
| Size | 4,348 sq ft |
| Space Use | Industrial |
| Condition | Shell And Core |
| Available | Now |
The new estate road is in the final phase of construction, opening up all of the individual development sites across the 60 acre business park. We are now in negotiations with a number of other key occupiers across the park and can offer bespoke industrial facilities from 14,365 sq.ft. to 77,600 sq.ft. that can be delivered in 12-15 months.
Presented by
Airport Business Park | Cherry Orchard Way
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
