Log In/Sign up
Your email has been sent.
Investment Highlights
- Prime established commercial location on the A5 in Rugby
- Europark lies within the ‘Golden Triangle’ placing approximately 85% of England and Wales within 4 hours drive time
- Junctions 18 and 20 of the M1, Junction 1 of the M6 and the A14 all accessible within minutes
- Short distance from Magna Park (Lutterworth) to the north and DIRFT to the south
Executive Summary
All enabling infrastructure is completed. Construction can commence on completion of all legal documentation, allowing for the building to be completed in as little as 10-12 months.
To buy or rent. Terms available on request.
To buy or rent. Terms available on request.
Property Facts
| Sale Type | Investment or Owner Occupier | Construction Status | Proposed |
| Tenure | Freehold | Net Internal Area (NIA) | 24,052 sq ft |
| Property Type | Industrial | No. Floors | 1 |
| Property Subtype | Warehouse | Year Built | 2026 |
| Costar Property Class | B | Tenancy | Single |
| Total Plot Size | 34.36 ac | Eaves Height | 29 ft 5 in (8.97 m) |
| Sale Type | Investment or Owner Occupier |
| Tenure | Freehold |
| Property Type | Industrial |
| Property Subtype | Warehouse |
| Costar Property Class | B |
| Total Plot Size | 34.36 ac |
| Construction Status | Proposed |
| Net Internal Area (NIA) | 24,052 sq ft |
| No. Floors | 1 |
| Year Built | 2026 |
| Tenancy | Single |
| Eaves Height | 29 ft 5 in (8.97 m) |
Amenities
- Roller Shutters
Space Availability
- Space
- Size
- Space Use
- Fit-Out
- Available
All enabling infrastructure is completed. Construction can commence on completion of all legal documentation, allowing for the building to be completed in as little as 10-12 months.
| Space | Size | Space Use | Fit-Out | Available |
| Ground | 24,052 sq ft | Industrial | Shell And Core | Now |
Ground
| Size |
| 24,052 sq ft |
| Space Use |
| Industrial |
| Fit-Out |
| Shell And Core |
| Available |
| Now |
Ground
| Size | 24,052 sq ft |
| Space Use | Industrial |
| Fit-Out | Shell And Core |
| Available | Now |
All enabling infrastructure is completed. Construction can commence on completion of all legal documentation, allowing for the building to be completed in as little as 10-12 months.
1 1
1 of 3
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
Phase 2 | A5 Watling St
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.


