Your email has been sent.
Investment Highlights
- Site area 9.814 acres.
- 75,000 cars passing daily.
- Impressive entrance lobby and reception area,.
- Generous parking for 229 cars.
- Prominent roundabout location with immediate access to A19 and A689.
- Four parallel interconnected bays with service and loading.
- The roof has recently been completely refurbished with a new protective coating.
Executive Summary
The property is held by way of a 999 year long leasehold interest from 16 September 2005.
The property comprises a modern purpose-built factory facility, of steel portal frame construction with profile, insulated steel cladding to external walls and roof. The building is set out as four parallel interconnected bays with service and loading access at either end. The front of the building contains an impressive entrance lobby and reception area, leading to the offices and amenity areas. The remaining bays provide storage and workshop accommodation with goods inward and dispatch bays at opposite ends. The roof has approximately 17% skylight coverage providing natural light to the workshop areas. The roof is drained by a symphonic drainage system installed to the valley gutters. The roof has recently been completely refurbished with a new protective coating and a secondary symphonic drainage system and overflows installed to valleys. The works are subject to a new 20-year warranty.
Property Facts
| Sale Type | Owner Occupier | No. Floors | 1 |
| Tenure | Long Leasehold | Year Built | 2000 |
| Property Type | Industrial | Tenancy | Single |
| Property Subtype | Warehouse | Parking Allocation | 2.47/1,000 sq ft |
| Costar Property Class | B | Eaves Height | 30 ft (9.14 m) |
| Total Plot Size | 103.55 ac | No. Drive In / Grade-Level Doors | 4 |
| Net Internal Area (NIA) | 124,031 sq ft |
| Sale Type | Owner Occupier |
| Tenure | Long Leasehold |
| Property Type | Industrial |
| Property Subtype | Warehouse |
| Costar Property Class | B |
| Total Plot Size | 103.55 ac |
| Net Internal Area (NIA) | 124,031 sq ft |
| No. Floors | 1 |
| Year Built | 2000 |
| Tenancy | Single |
| Parking Allocation | 2.47/1,000 sq ft |
| Eaves Height | 30 ft (9.14 m) |
| No. Drive In / Grade-Level Doors | 4 |
Amenities
- Fenced Lot
- Security System
- Yard
- On-Site Security Staff
Space Availability
- Space
- Size
- Space Use
- Condition
- Available
The property comprises a modern purpose-built factory facility, of steel portal frame construction with profile, insulated steel cladding to external walls and roof. The building is set out as four parallel interconnected bays with service and loading access at either end. The front of the building contains an impressive entrance lobby and reception area, leading to the offices and amenity areas. The remaining bays provide storage and workshop accommodation with goods inward and dispatch bays at opposite ends. The roof has approximately 17% skylight coverage providing natural light to the workshop areas. The roof is drained by a symphonic drainage system installed to the valley gutters. The roof has recently been completely refurbished with a new protective coating and a secondary symphonic drainage system and overflows installed to valleys. The works are subject to a new 20-year warranty.
| Space | Size | Space Use | Condition | Available |
| Ground | 124,031 sq ft | Industrial | Partial Fit-Out | Now |
Ground
| Size |
| 124,031 sq ft |
| Space Use |
| Industrial |
| Condition |
| Partial Fit-Out |
| Available |
| Now |
Ground
| Size | 124,031 sq ft |
| Space Use | Industrial |
| Condition | Partial Fit-Out |
| Available | Now |
The property comprises a modern purpose-built factory facility, of steel portal frame construction with profile, insulated steel cladding to external walls and roof. The building is set out as four parallel interconnected bays with service and loading access at either end. The front of the building contains an impressive entrance lobby and reception area, leading to the offices and amenity areas. The remaining bays provide storage and workshop accommodation with goods inward and dispatch bays at opposite ends. The roof has approximately 17% skylight coverage providing natural light to the workshop areas. The roof is drained by a symphonic drainage system installed to the valley gutters. The roof has recently been completely refurbished with a new protective coating and a secondary symphonic drainage system and overflows installed to valleys. The works are subject to a new 20-year warranty.
Presented by
Pegasus House | Wynard Ave
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.






