Share This Listing

Message

955 characters remaining

Hmm, there seems to have been an error sending your message. Please try again.

Your email has been sent.

Still interested?

Contact the agents for more information about this property

Highlights

  • 2 miles south of Wakefield city centre
  • Scenic waterfront
  • 3 miles north-east of J39 of the M1

Features

Drive-in Bays
3
Standard Parking Spaces
6

All Available Spaces(3)

Display Rent as

  • Space
  • Size
  • Term
  • Rate
  • Space Use
  • Fit-Out
  • Available
  • Ground, 1st Floor
  • 1,700 sq ft
  • Negotiable
  • Upon Application Upon Application Upon Application Upon Application
  • Industrial
  • -
  • 01/08/2027

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):

Ground - 850 sq ft
1st Floor - 850 sq ft

These units are ideally suited for a range of business needs, featuring a steel portal frame construction with breeze block lower walls, insulated cladding, a first floor office space with air conditioning, 3 phase power supply, and an EPC rating of A (22). Located within a modern business park, the development benefits from excellent transport links, shared secure parking with perimeter fencing, and full services including power, lighting, water, and drainage. Currently in the outline planning stage, detailed designs will be finalised by October 2025. Construction is scheduled to commence 2026, with completion expected by Q2 2027, ensuring a swift timeline for occupancy.

  • Use Class: B2
  • Partitioned Offices
  • Energy Performance Rating - A
  • 3 phase power supply
  • Central Air Conditioning
  • Natural Light
  • Insulated cladding
  • Breeze block lower walls
  • Ground, 1st Floor
  • 1,700 sq ft
  • Negotiable
  • Upon Application Upon Application Upon Application Upon Application
  • Industrial
  • -
  • 01/08/2027

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):

Ground - 850 sq ft
1st Floor - 850 sq ft

These units are ideally suited for a range of business needs, featuring a steel portal frame construction with breeze block lower walls, insulated cladding, a first floor office space with air conditioning, 3 phase power supply, and an EPC rating of A (22). Located within a modern business park, the development benefits from excellent transport links, shared secure parking with perimeter fencing, and full services including power, lighting, water, and drainage. Currently in the outline planning stage, detailed designs will be finalised by October 2025. Construction is scheduled to commence 2026, with completion expected by Q2 2027, ensuring a swift timeline for occupancy.

  • Use Class: B2
  • Partitioned Offices
  • Energy Performance Rating - A
  • 3 phase power supply
  • Central Air Conditioning
  • Natural Light
  • Insulated cladding
  • Breeze block lower walls
  • Ground, 1st Floor
  • 1,700 sq ft
  • Negotiable
  • Upon Application Upon Application Upon Application Upon Application
  • Industrial
  • -
  • 01/08/2027

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):

Ground - 850 sq ft
1st Floor - 850 sq ft

These units are ideally suited for a range of business needs, featuring a steel portal frame construction with breeze block lower walls, insulated cladding, a first floor office space with air conditioning, 3 phase power supply, and an EPC rating of A (22). Located within a modern business park, the development benefits from excellent transport links, shared secure parking with perimeter fencing, and full services including power, lighting, water, and drainage. Currently in the outline planning stage, detailed designs will be finalised by October 2025. Construction is scheduled to commence 2026, with completion expected by Q2 2027, ensuring a swift timeline for occupancy.

  • Use Class: B2
  • Partitioned Offices
  • Energy Performance Rating - A
  • 3 phase power supply
  • Central Air Conditioning
  • Natural Light
  • Insulated cladding
  • Breeze block lower walls
Space Size Term Rate Space Use Fit-Out Available
Ground, 1st Floor 1,700 sq ft Negotiable Upon Application Upon Application Upon Application Upon Application Industrial - 01/08/2027
Ground, 1st Floor 1,700 sq ft Negotiable Upon Application Upon Application Upon Application Upon Application Industrial - 01/08/2027
Ground, 1st Floor 1,700 sq ft Negotiable Upon Application Upon Application Upon Application Upon Application Industrial - 01/08/2027

Ground, 1st Floor

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):

Size
Ground - 850 sq ft
1st Floor - 850 sq ft
Term
Negotiable
Rate
Upon Application Upon Application Upon Application Upon Application
Space Use
Industrial
Fit-Out
-
Available
01/08/2027

Ground, 1st Floor

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):

Size
Ground - 850 sq ft
1st Floor - 850 sq ft
Term
Negotiable
Rate
Upon Application Upon Application Upon Application Upon Application
Space Use
Industrial
Fit-Out
-
Available
01/08/2027

Ground, 1st Floor

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):

Size
Ground - 850 sq ft
1st Floor - 850 sq ft
Term
Negotiable
Rate
Upon Application Upon Application Upon Application Upon Application
Space Use
Industrial
Fit-Out
-
Available
01/08/2027

Ground, 1st Floor

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):
Size
Ground - 850 sq ft
1st Floor - 850 sq ft
Term Negotiable
Rate Upon Application
Space Use Industrial
Fit-Out -
Available 01/08/2027

These units are ideally suited for a range of business needs, featuring a steel portal frame construction with breeze block lower walls, insulated cladding, a first floor office space with air conditioning, 3 phase power supply, and an EPC rating of A (22). Located within a modern business park, the development benefits from excellent transport links, shared secure parking with perimeter fencing, and full services including power, lighting, water, and drainage. Currently in the outline planning stage, detailed designs will be finalised by October 2025. Construction is scheduled to commence 2026, with completion expected by Q2 2027, ensuring a swift timeline for occupancy.

  • Use Class: B2
  • Central Air Conditioning
  • Partitioned Offices
  • Natural Light
  • Energy Performance Rating - A
  • Insulated cladding
  • 3 phase power supply
  • Breeze block lower walls

Ground, 1st Floor

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):
Size
Ground - 850 sq ft
1st Floor - 850 sq ft
Term Negotiable
Rate Upon Application
Space Use Industrial
Fit-Out -
Available 01/08/2027

These units are ideally suited for a range of business needs, featuring a steel portal frame construction with breeze block lower walls, insulated cladding, a first floor office space with air conditioning, 3 phase power supply, and an EPC rating of A (22). Located within a modern business park, the development benefits from excellent transport links, shared secure parking with perimeter fencing, and full services including power, lighting, water, and drainage. Currently in the outline planning stage, detailed designs will be finalised by October 2025. Construction is scheduled to commence 2026, with completion expected by Q2 2027, ensuring a swift timeline for occupancy.

  • Use Class: B2
  • Central Air Conditioning
  • Partitioned Offices
  • Natural Light
  • Energy Performance Rating - A
  • Insulated cladding
  • 3 phase power supply
  • Breeze block lower walls

Ground, 1st Floor

The 2 spaces in this building must be leased together, for a total size of 1,700 sq ft (Contiguous Area):
Size
Ground - 850 sq ft
1st Floor - 850 sq ft
Term Negotiable
Rate Upon Application
Space Use Industrial
Fit-Out -
Available 01/08/2027

These units are ideally suited for a range of business needs, featuring a steel portal frame construction with breeze block lower walls, insulated cladding, a first floor office space with air conditioning, 3 phase power supply, and an EPC rating of A (22). Located within a modern business park, the development benefits from excellent transport links, shared secure parking with perimeter fencing, and full services including power, lighting, water, and drainage. Currently in the outline planning stage, detailed designs will be finalised by October 2025. Construction is scheduled to commence 2026, with completion expected by Q2 2027, ensuring a swift timeline for occupancy.

  • Use Class: B2
  • Central Air Conditioning
  • Partitioned Offices
  • Natural Light
  • Energy Performance Rating - A
  • Insulated cladding
  • 3 phase power supply
  • Breeze block lower walls

Property Overview

The prime central location offers excellent accessibility, surrounded by Wakefield's vibrant amenities and benefiting from the scenic waterfront setting-an attractive draw for clients and employees. The site is situated approximately 2 miles south of Wakefield city centre and 3 miles north-east of J39 of the M1.

Warehouse Facility Facts

Property Size
5,100 sq ft
Total Plot Size
8.12 ac
Year Built
2027
Construction
Steel
  • Listing ID: 41576821

  • Date on Market: 06/08/2026

  • Last Updated:

  • Address: Waterside Way, Wakefield WF1 5ED

Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}